SAP C-P2W22-2504 Exam Overview:
| Certification Vendor: | SAP |
| Exam Name: | SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing |
| Exam Number: | C_P2W22_2504 |
| Available Languages: | English |
| Exam Format: | Multiple-choice (single answer), Multiple-response questions |
| Exam Duration: | 180 minutes |
| Related Certifications: | C_TS422_2504 |
| Passing Score: | 65–68% |
| Real Exam Qty: | 80–82 |
| Recommended Training: | SAP S/4HANA Training Overview SAP Learning Hub |
| Exam Registration: | SAP Training & Certification |
| Sample Questions: | SAP C-P2W22-2504 Sample Questions |
| Exam Way: | Online proctored via SAP Certification Hub |
| Pre Condition: | None officially required |
SAP C-P2W22-2504 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Introduction to SAP S/4HANA Production Planning | <=10% | - Production planning concepts and MRP vs consumption-based planning |
| Topic 2: Lean Manufacturing | <=10% | - Repetitive manufacturing, Kanban, line loading |
| Topic 3: Demand Management in SAP S/4HANA | <=10% | - Production strategies (make-to-order, make-to-stock, assembly planning) |
| Topic 4: Material Requirements Planning (MRP) | <=10% | - MRP run, lot sizing, planning strategies |
| Topic 5: Master Data | 11–20% | - Bill of materials (BOM), routing, production versions |
| Topic 6: Capacity Planning | <=10% | - Capacity evaluation and planning tables |
| Topic 7: Introduction to SAP S/4HANA Supply Chain Planning | <=10% | - SAP S/4HANA fundamentals and supply chain planning overview |
| Topic 8: Production Orders | 11–20% | - Order management, confirmations, and availability checks |
| Topic 9: Process Orders | <=10% | - Process manufacturing execution and control |
| Topic 10: Advanced Planning (PP/DS) | 11–20% | - Advanced planning tools and heuristics - Detailed scheduling and planning board usage |
SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Sample Questions:
1. Which of the following are replenishment strategies for Kanban containers?
Note: There are 2 correct answers to this question.
A) Replenishment using process orders
B) Replenishment using reservations
C) Replenishment using direct transfer posting
D) Replenishment using planned independent requirements
2. What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.
A) To determine the lowest explosion level at which a material occurs in all the product structures
B) To determine the priority of alternative components inside the material BOM (bill of material)
C) To determine the use of subitems inside the material BOM (bill of material)
D) To determine the sequence in which materials are planned in MRP
3. You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
A) Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
B) Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
C) Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
D) Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
4. What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
A) Sequencing on multi-activity resources is automatically updated during planning.
B) Operations on multi-resources are planned finitely in a sequence.
C) An operation is scheduled as close as possible to the desired date.
D) To create a slot, neighbouring operations are moved in both planning directions.
5. What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
A) Material is only kept available in small quantities in production.
B) Replenishment is only triggered when components are required.
C) Material stock is built up for a long period of time in production.
D) Replenishment is always triggered on a regular basis.
Solutions:
| Question # 1 Answer: B,C | Question # 2 Answer: A,D | Question # 3 Answer: A | Question # 4 Answer: C | Question # 5 Answer: A,B |