Medical Professional CCM Exam Overview:
| Certification Vendor: | CCMC |
|---|---|
| Exam Name: | Certified Case Manager Certification Exam |
| Exam Number: | CCM |
| Exam Duration: | 180 minutes |
| Related Certifications: | Certified Case Manager |
| Real Exam Qty: | 180 |
| Exam Price: | $425 USD |
| Certificate Validity Period: | 5 Years |
| Available Languages: | English |
| Exam Format: | Multiple Choice Single Answer |
| Sample Questions: | Medical Professional CCM Sample Questions |
| Exam Way: | Online Proctored (via Pearson VUE OnVUE) / Testing Center |
| Pre Condition: | Current, active, and unrestricted health or human services licensure/certification OR a Baccalaureate/Graduate degree in an approved field, alongside minimum 12-24 months of full-time case management experience. |
| Official Syllabus URL: | https://ccmcertification.org |
Medical Professional CCM Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Rehabilitation Concepts and Strategies | 9% | - Worker recovery and return-to-work solutions - Vocational and physical rehabilitation pathways
|
| Ethical, Legal, and Practice Standards | 15% | - Regulatory compliance requirements and frameworks
|
| Care Delivery and Reimbursement Methods | 31% | - Case management concepts, processes, and principles - Reimbursement pathways and utilization management tools
|
| Quality and Outcomes Evaluation and Measurements | 18% | - Caseload calculation metrics and tracking standards - Quality indicator metrics and performance tools
|
| Psychosocial Concepts and Support Systems | 27% | - Client dynamics and social determinants of health
|
Medical Professional Certified Case Manager Certification Exam (CCM) Sample Questions:
Which FIDIC Book (edition 2017) should be considered first by an Employer that is an experienced employer who knows exactly what they want from a design & engineering perspective?
- A. Yellow or Silver Book
- B. Yellow Book
- C. Silver Book
- D. Red Book
Correct Answer: D 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
(FIDIC Red Book (edition 2017) stipulates that the measurement shall be made as per the actual quantities executed at Site. Which one of the following statements is correct?)
- A. None of the above are correct.
- B. Measurements of the actual quantity of an item of the Permanent Works that was not specified in the Bill of Quantities, the Contractor will choose the appropriate price.
- C. The measurement shall be always made of the net actual quantity of each item of the Permanent Works.
- D. The measurement shall be made of actual quantity of each item of the Permanent Works with allowance of shrinkage of the used materials.
Correct Answer: C 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
(You are the Contract Manager in a contract using the FIDIC Red Book with a Dispute Avoidance and Adjudication Board. The DAAB is already appointed (standing DAAB). You are coaching your team on the steps to be followed to request for informal assistance from the DAAB during a Site visit. Which one of the following does NOT belong to those steps?)
- A. Both Parties should be present at the meeting in which the DAAB provides assistance.
- B. The Employer and the Contractor have made a " joint request " in writing before the DAAB gives the requested assistance.
- C. The Engineer has made a non-objection letter, in which it is stated that the issue/disagreement does not concern the matter that is being dealt with by the Engineer.
- D. The Employer and the Contractor have identified an issue and disagreement, and have agreed between themselves that they want the DAAB to provide assistance and/or informally discuss and attempt to resolve that issue/disagreement.
Correct Answer: C 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
(Both FIDIC Silver Book (SB) and Yellow Book (YB) (edition 1999) mention the Contractor scrutinising the Employer ' s Requirements. Which statement is correct?)
- A. Scrutinising in FIDIC Silver Book 1999 means that the Contractor should read the Employer's Requirements very thoroughly after the contract closes and see if the Employer's Requirements is complete or if something is missing.
- B. Scrutinising in FIDIC Yellow Book 1999 means that the Contractor has the opportunity after the contract close to report on any errors, mistakes or conflicts in the Employer's Requirements. In the FIDIC Silver Book 1999 scrutinising provides that obligation during the tender period; the Contractor has to review and verify the Employer's Requirements more strictly before submitting the tender.
- C. Scrutinising in FIDIC Yellow Book 1999 and Silver Book 1999 means that the Contractor must ask the Employer to check the Employer's Requirements very well to see if the Works can be built on that location according to the Employer's Requirements.
- D. Scrutinising in FIDIC Yellow Book 1999 means the same as in FIDIC Silver Book 1999; in both models it means that after the contract closes and before starting the actual making of the design, the Contractor has to read the Employer's Requirements very thoroughly and check on any errors, omissions or conflicts.
Correct Answer: B 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
In the FIDIC Silver Book (edition 1999), if the Employer has instructed the Contractor as per Sub-Clause 8.6 to provide a revised programme to stay within Time of Completion, the Employer can claim additional costs.
This only applies if the revised programme is still too slow to complete the Works within the Time for Completion. Is this statement true or false?
- A. False
- B. True
Correct Answer: B 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
We're so confident of our products that we provide no hassle product exchange.


By Ann

