Construction Specifications Institute CDT Exam Overview:
| Certification Vendor: | Construction Specifications Institute (CSI) |
| Exam Name: | Construction Documents Technologist (CDT) Exam |
| Exam Number: | CDT |
| Related Certifications: | Certified Construction Specifier (CCS) Certified Construction Contract Administrator (CCCA) Certified Construction Product Representative (CCPR) |
| Certificate Validity Period: | 3 years (continuing education renewal required) |
| Exam Format: | Multiple-choice |
| Available Languages: | English |
| Recommended Training: | CSI CDT Exam Prep Resources |
| Exam Registration: | CSI Certification Registration |
| Sample Questions: | Construction Specifications Institute CDT Sample Questions |
| Exam Way: | Computer-based exam (online or test center depending on provider availability) |
| Pre Condition: | No formal prerequisite required; recommended familiarity with construction documentation and project delivery processes. |
| Official Syllabus URL: | https://www.csiresources.org/certification/cdt |
Construction Specifications Institute CDT Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Construction Administration | - Quality control and compliance - Submittals, RFIs, and site observations |
| Contract Administration | - Contract documents hierarchy and interpretation - Change orders and claims |
| Integrated Practice and BIM | - Integrated project delivery workflows - Building Information Modeling (BIM) coordination |
| Project Manual and Specifications | - Specification writing fundamentals - MasterFormat structure and specification organization |
| Construction Documents | - Division 00 and Division 01 documents overview - Drawing and specification coordination |
| Project Delivery Methods | - Roles and responsibilities of project participants - Design-Bid-Build, Design-Build, CM at Risk |
| Procurement and Bidding | - Addenda and substitutions - Bid procedures and contract award processes |
Construction Specifications Institute Construction Documents Technologist Sample Questions:
1. What determines the responsibilities of the participants on the project team?
A) Size of the project
B) Nature of the project
C) Cost of construction
D) Project delivery type
2. When preparing their bid, a contractor organizes their costs into different categories. The following items are examples of which type of cost?
* Permits and inspections
* Mobilization and startup
* Jobsite safety and security procedures, including personnel
* Administrative costs attributable to the work
A) Contingency
B) Construction
C) Overhead
D) Insurance
3. What four considerations are included in site selection programming?
A) Use, space, funds, date
B) Purpose, shape, cost, schedule
C) Goal, condition, budget, calendar
D) Function, form, economy, time
4. If the contractor discovers that a part of the contract documents is in violation of the building code, what should the contractor do?
A) Request a variance from the building authority
B) Notify the architect/engineer in writing
C) Proceed with the work in accordance with the contract documents
D) Stop all work until the issue is resolved
5. When innovative or unusual design techniques are proposed, it is advised to have what type of review?
A) Sustainability
B) Budget
C) Constructability
D) Design
Solutions:
| Question # 1 Answer: D | Question # 2 Answer: C | Question # 3 Answer: D | Question # 4 Answer: B | Question # 5 Answer: C |