ISTQB CTAL-TTA Exam Overview:
| Certification Vendor: | ISTQB |
| Exam Name: | ISTQB Certified Tester Advanced Level - Technical Test Analyst |
| Exam Number: | CTAL-TTA |
| Certificate Validity Period: | No expiration (lifetime validity) |
| Real Exam Qty: | 40 |
| Available Languages: | English, German, French, Spanish, Japanese, Chinese, Portuguese |
| Related Certifications: | ISTQB CTFL (Foundation Level) ISTQB CTAL-TA (Technical Test Analyst) ISTQB CTAL-TM (Test Manager) |
| Passing Score: | 65% |
| Exam Price: | USD 200-300 (varies by national board) |
| Exam Duration: | 120 minutes |
| Exam Format: | Multiple Choice |
| Sample Questions: | ISTQB CTAL-TTA Sample Questions |
| Exam Way: | Written/Paper-based or Computer-Based Testing (CBT) at authorized exam centers |
| Pre Condition: | ISTQB CTFL (Foundation Level) certification is recommended; Advanced Level certifications require Foundation Level as prerequisite |
| Official Syllabus URL: | https://www.istqb.org/certifications/advanced-level/technical-test-analyst |
ISTQB CTAL-TTA Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Testing of Quality Characteristics | 20% | - Testing Reliability - Testing Security - Testing Performance Efficiency - Testing Portability - Testing Functional Suitability - ISO 25010 Quality Model - Testing Compatibility - Testing Maintainability - Testing Usability |
| Topic 2: Technical Test Analysis | 25% | - Risk-Based Testing - Coverage Measurement for Test Basis - Error Guessing - Experience-Based Techniques - Specification-Based Techniques - Stakeholder Analysis |
| Topic 3: Defect Management and Test Reporting | 15% | - Defect Classification - Test Exit Criteria - Defect Reporting and Lifecycle - Test Progress Monitoring - Test Summary Reporting |
| Topic 4: Test Automation | 20% | - Business Process Automation - Criteria for Automation Tool Selection - Pilot and Rollout Planning - Test Automation Infrastructure - Automation Integration - Architecture for Automation |
| Topic 5: Static and Dynamic Analysis | 20% | - Memory Leaks Detection - Resource Usage Analysis - Static Analysis Techniques - Data Flow Analysis - Dynamic Analysis Concepts - Control Flow Analysis - Code and Peer Reviews |
ISTQB Certified Tester Advanced Level Technical Test Analyst Sample Questions:
1. Which of the following is a valid reason for including security testing in a test approach?
A) To provide measurements from which an overall level of availability can be obtained.
B) There is a threat of unauthorized copying of applications or data.
C) To evaluate the ability of a system to handle peak loads at or beyond the limits of its anticipated or specified workloads
D) Software changes will be frequent after it enters production.
2. Consider the code fragment provided below:
The comment frequency of the code fragment is 13%.
To which non-functional quality characteristic does a good level of comment frequency especially contribute?
A) Portability
B) Performance Efficiency
C) Maintainability
D) Usability
3. You have conducted static analysis on several new modules for an existing product. You are now executing test cases and are seeing inconsistent problems including crashes. Intermittent error messages are appearing.
Despite all your best efforts, you are not able to find reproducible scenarios to force these errors.
What problem in the code are you likely seeing?
A) Wild pointers
B) Undefined variables
C) Instrumented code
D) Poor error handling
4. Which of the following is true regarding maintainability?
A) This factor becomes more Important the longer the system remains in the production environment
B) This factor will influence the performance of the system
C) This factor Is critical for the initial success of the product launch
D) This factor affects resource utilization
5. As Technical Test Analyst on a test automation project covering the acquisition of a commercial test execution tool, what would you MOST likely be responsible for?
A) Approving the estimated costs for implementing the test automation project
B) Defining the business processes that will be used for keyword-driven testing
C) Determining who will execute the automated tests
D) Creating and supplying the data to be accessed by keyword-driven automation scripts
Solutions:
| Question # 1 Answer: B | Question # 2 Answer: C | Question # 3 Answer: A | Question # 4 Answer: A | Question # 5 Answer: D |
We're so confident of our products that we provide no hassle product exchange.


By Ken

