Motorola Solutions MSC-111 Exam Overview:
| Certification Vendor: | Motorola Solutions |
| Exam Name: | Design Point (PTP and PMP) Solutions |
| Exam Number: | MSC-111 |
| Available Languages: | English |
| Exam Price: | USD 100-200 (varies by region and training partner) |
| Real Exam Qty: | 114 |
| Exam Format: | Multiple Choice, Scenario-based Questions, Multiple Response |
| Related Certifications: | Motorola Solutions Design and Deploy Certifications PTP (Point-to-Point) Solutions PMP (Point-to-Multipoint) Solutions |
| Passing Score: | 70-80% |
| Exam Duration: | 90-120 |
| Certificate Validity Period: | Typically 3 years (may vary by certification program update) |
| Sample Questions: | Motorola Solutions MSC-111 Sample Questions |
| Exam Way: | Typically online proctored or test center-based exam depending on authorized training provider |
| Pre Condition: | Recommended knowledge of basic RF principles and networking fundamentals; prior experience with wireless broadband or Motorola PMP/PTP systems is beneficial but not strictly required. |
| Official Syllabus URL: | https://www.motorolasolutions.com |
Motorola Solutions MSC-111 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Point-to-Multipoint (PMP) Solutions Design | 30% | - Capacity and scalability
|
| Network Performance and Optimization | 20% | - QoS and traffic management
|
| Wireless Network Design Fundamentals | 20% | - Link budgeting basics
|
| Point-to-Point (PTP) Solutions Design | 30% | - Interference and spectrum management
|
Motorola Solutions Design Point (PTP and PMP) Solutions Sample Questions:
1. A customer wishes to install a Motorola PMP 5.7GHz AP on a tower at 75 meters (246 ft).
There is already another Non-Motorola 5.7GHz AP located at 77 meters (252 ft) facing the same direction. What method could be used to co-locate the Motorola AP on this tower, minimizing interference?
A) Perform a spectrum analysis of the frequency band and use the same channel as the other AP. Change polarization of the antenna to opposite of the other AP. Mount AP as planned.
B) Perform a spectrum analysis of the frequency band and chose a channel that is not the same as the other AP. Mount AP as planned.
C) Perform a spectrum analysis of the frequency band and chose a channel that is not the same as the other AP. Mount AP 30 meters (100ft) vertical distance away from the existing
AP.
D) Add a CMM Micro for timing to the new AP and mount the AP as planned.
2. Scenario
The following question relates to the General" TAB from the Project Description Template and the information provided by the client (Project Description, Project Details, and Lymmo
Map). This is a scenario based question. Please click on the scenario button at the bottom before answering the question.
Rows 26 through 31 from the Project Description Template are related to the design information received from the client. There are a total of 5 relevant fields. Given the information provided in the Proposal Description, Project Details, and Lymmo Map, which of the following required information still needs to be gathered?

A) Test/acceptance criteria
B) Network requirements
C) Throughput requirements
D) Maps
E) Coverage criteria
3. When using Broadband Planner to model a PMP link, the amount of attenuation through a given obstruction type can be changed by modifying the:
A) antenna gain.
B) network links settings.
C) propagation model parameters.
D) parts library.
4. Using Link Planner:
In this scenario we will be using Link Planner as one of the planning tools to prepare a proposal for a FTP link between two buildings. The first building will be identified as the
Maitland building and the second building will be identified as the Lake Mary building. A
LinkPlanner Exhibit is accessible by clicking the Exhibit button.
The wavy line along the X-axis of the LinkPlanner Exhibit indicates the terrain between these two example endpoints. This information was obtained from Motorola's FTP Path
Profiler Server by first entering which of the following into the Link Planner tool?
A) Street Addresses
B) GPS coordinates
C) Closest intersecting streets
D) Spectrum Analyzer results
5. When your design calls for a PMP100 series product, which type of path meets the minimum requirements for an acceptable link?
A) Line-of-sight is irrelevant
B) Near line-of-sight
C) Line-of-sight
D) Non line-of-sight
Solutions:
| Question # 1 Answer: C | Question # 2 Answer: A | Question # 3 Answer: C | Question # 4 Answer: B | Question # 5 Answer: C |
We're so confident of our products that we provide no hassle product exchange.


By Byron

