Network Appliance NS0-014 Exam Overview:
| Certification Vendor: | NetApp (Network Appliance) |
| Exam Name: | Implementation Engineer - MetroCluster Exam |
| Exam Number: | NS0-014 |
| Certificate Validity Period: | 2 years |
| Exam Duration: | 90 minutes |
| Exam Format: | Multiple Choice, Drag and Drop, Scenario-based |
| Related Certifications: | NetApp Certified Data Administrator, ONTAP (NCDA ONTAP) NetApp Certified Implementation Engineer |
| Real Exam Qty: | 60 |
| Exam Price: | 150 USD |
| Available Languages: | English |
| Passing Score: | 65% |
| Recommended Training: | NetApp MetroCluster Implementation Training ONTAP High Availability and MetroCluster Documentation |
| Exam Registration: | Pearson VUE NetApp Learning Center |
| Sample Questions: | Network Appliance NS0-014 Sample Questions |
| Exam Way: | Online proctored or Onsite at authorized test centers |
| Pre Condition: | Must hold NetApp Certified Data Administrator, ONTAP (NCDA ONTAP) certification |
| Official Syllabus URL: | https://learningcenter.netapp.com/ |
Network Appliance NS0-014 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Implementation and Configuration | 30% | - MetroCluster software configuration - Cluster and storage configuration - SnapMirror and disaster recovery integration - Inter-site networking and connectivity setup - Planning and preparation |
| MetroCluster Concepts and Architecture | 25% | - Data replication and consistency mechanisms - Hardware and software components - High availability and failover principles - FC and IP MetroCluster architectures |
| Testing, Validation and Troubleshooting | 15% | - Implementation validation and testing - Troubleshooting common issues and errors - Failover and switchover testing - Monitoring and performance management |
| MetroCluster Solution Assessment | 20% | - Business requirements and recovery objectives - Site and infrastructure requirements - Interoperability and compatibility verification |
| Upgrade, Expansion and Transition | 10% | - Expanding existing MetroCluster environments - Software and hardware upgrade procedures - Migration and transition methodologies |
Network Appliance Implementation Engineer - MetroCluster Sample Questions:
1. What are the two types of MetroCluster configurations available? (Select two)
A) Ethernet MetroCluster
B) IP MetroCluster
C) FC MetroCluster
D) MPLS MetroCluster
2. During a MetroCluster installation, which component is responsible for ensuring automatic failover in the event of a site failure?
A) ATTO FibreBridge
B) SnapVault
C) SyncMirror
D) ONTAP Mediator
3. What is the primary purpose of the MetroCluster Tiebreaker in disaster recovery testing?
A) To automatically upgrade ONTAP
B) To verify that storage shelves are properly synchronized
C) To perform data deduplication
D) To manage automatic failover between sites
4. Which component is critical for maintaining high availability during a MetroCluster upgrade?
A) ATTO FibreBridge
B) Mediator
C) Tiebreaker
D) SyncMirror
5. If the metrocluster check command returns errors, what is the most likely next step?
A) Replace the storage controllers
B) Reinstall MetroCluster
C) Perform a manual switchover
D) Analyze the error logs in Config Advisor
Solutions:
| Question # 1 Answer: B,C | Question # 2 Answer: D | Question # 3 Answer: D | Question # 4 Answer: C | Question # 5 Answer: D |
We're so confident of our products that we provide no hassle product exchange.


By Andrew

