Cisco 200-120 Exam Overview:
| Certification Vendor: | Cisco |
|---|---|
| Exam Name: | CCNA Routing and Switching (200-120) Exam |
| Exam Number: | 200-120 |
| Passing Score: | Variable (scaled score system, typically around 825/1000) |
| Certificate Validity Period: | 3 years |
| Exam Price: | USD 295 (varies by region) |
| Real Exam Qty: | 50–60 (varies) |
| Related Certifications: | Cisco Certified Network Associate (CCNA Routing and Switching) Cisco Certified Entry Networking Technician (CCENT) |
| Available Languages: | Japanese, English |
| Exam Format: | Drag and drop, Multiple answer, Simulations (simlets), Multiple choice |
| Exam Duration: | 90 minutes |
| Recommended Training: | Cisco CCNA Training (Official) Cisco Networking Academy |
| Exam Registration: | Cisco Certification Portal Pearson VUE Cisco Exams |
| Sample Questions: | Cisco 200-120 Sample Questions |
| Exam Way: | Computer-based exam delivered via Pearson VUE testing centers or online proctoring (where available) |
| Pre Condition: | No formal prerequisites. CCENT (ICND1) knowledge recommended (historical structure). |
| Official Syllabus URL: | https://www.cisco.com/c/en/us/training-events/training-certifications/certifications/associate/ccna.html |
Cisco 200-120 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Infrastructure Services | 20% | - IP services
|
| Routing Technologies | 25% | - IP connectivity
|
| LAN Switching Technologies | 25% | - Spanning Tree Protocol
|
| Infrastructure Maintenance | 10% | - Network troubleshooting
|
| Network Fundamentals | 20% | - Network topologies and types
|
Cisco CCNA Cisco Certified Network Associate CCNA (803) Sample Questions:
Question 1
Scenario:
Refer to the topology. Your company has decided to connect the main office with three other remote branch offices using point-to-point serial links.
You are required to troubleshoot and resolve OSPF neighbor adjacency issues between the main office and the routers located in the remote branch offices.



An OSPF neighbor adjacency is not formed between R3 in the main office and R4 in the Branch1 office. What is causing the problem?
A. There is an OSPF hello and dead interval mismatch.
B. There is a Layer 2 issue; an encapsulation mismatch on serial links.
C. The R3 router ID is configured on R4.
D. There is an area ID mismatch.
Question 2
Which switch would STP choose to become the root bridge in the selection process?
A. 32769: 11-22-33-44-55-65
B. 32768: 22-33-44-55-66-77
C. 32769: 22-33-44-55-66-78
D. 32768: 11-22-33-44-55-66
Question 3
Which command reveals the last method used to powercycle a router?
A. show boot
B. show reload
C. show running-config
D. show version
Question 4
The output of the show frame-relay pvc command shows "PVC STATUS = INACTIVE". What does this mean?
A. The PVC is configured correctly and is operating normally, but no data packets have been detected for more than five minutes.
B. The PVC is configured correctly, is operating normally, and is waiting for interesting traffic to trigger a call to the remote router.
C. The PVC is configured correctly, is operating normally, and is no longer actively seeking the address of the remote router.
D. The PVC is not configured on the local switch.
E. The PVC is configured correctly on the local switch, but there is a problem on the remote end of the PVC.
Question 5
Refer to the exhibit.
Which switch provides the spanning-tree designated port role for the network segment that services the printers?
A. Switch2
B. Switch4
C. Switch3
D. Switch1
Solutions:
| Question 1 Answer: D | Question 2 Answer: D | Question 3 Answer: D | Question 4 Answer: E | Question 5 Answer: C |
We're so confident of our products that we provide no hassle product exchange.


By Carl

