SAP C_S4TM_2601 Exam Overview:
| Certification Vendor: | SAP |
| Exam Name: | SAP Certified Application Associate - SAP S/4HANA Cloud Private Edition, Transportation Management |
| Exam Number: | C_S4TM_2601 |
| Real Exam Qty: | 80 |
| Exam Format: | Multiple Choice, Multiple Response |
| Related Certifications: | SAP S/4HANA Cloud Private Edition certifications SAP Certified Application Associate - SAP S/4HANA Transportation Management |
| Exam Price: | Approximately USD 500 (varies by region) |
| Certificate Validity Period: | Typically 5 years (SAP certification validity policy may vary by release) |
| Passing Score: | Approximately 65% |
| Exam Duration: | 180 minutes |
| Available Languages: | English, German |
| Sample Questions: | SAP C_S4TM_2601 Sample Questions |
| Exam Way: | Online proctored or test center-based exam via SAP authorized testing providers |
| Pre Condition: | Basic knowledge of SAP S/4HANA logistics processes and transportation management concepts is recommended |
| Official Syllabus URL: | https://training.sap.com |
SAP C_S4TM_2601 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Transportation Planning and Execution | - Freight order and freight booking processing - Planning strategies and optimization - Freight unit building and consolidation |
| Transportation Management Fundamentals | - Deployment options: embedded vs decentralized TM - Key business processes in transportation planning and execution - Overview of SAP Transportation Management architecture |
| Master Data and Organizational Structure | - Locations, lanes, and transportation zones - Transportation network and resources - Business partner and carrier management |
| System Configuration and Fiori Applications | - Monitoring and analytics tools - SAP Fiori apps for transportation management - Core configuration settings in SAP TM |
| Integration and Execution Processes | - Order-to-cash and procure-to-pay transportation flows - Event management and tracking processes - Integration with SAP S/4HANA logistics components |
| Charge Calculation and Settlement | - Freight cost calculation setup - Freight settlement process - Charge management and condition techniques |
SAP Certified - SAP S/4HANA Cloud Private Edition, Transportation Management (C_S4TM_2601) Sample Questions:
1. A regional educational technology distributor uses SAP S/4HANA Transportation Management to plan outbound shipments for classroom installation kits and normal depot replenishment. Automatic planning reduces freight order count, and subcontracting to the contracted carrier works correctly. However, classroom installation kits are consolidated with replenishment freight that has more flexible delivery timing, causing some kits to miss scheduled school access periods.
The installation coordinator wants school access periods protected, while logistics wants to keep consolidation savings for normal depot replenishment. The constraint is to keep automatic planning and carrier subcontracting active while ensuring installation timing is respected before freight orders are released.
Which planning decision best supports the constraint?
Response:
A) Adjust planning criteria so school access periods restrict consolidation before freight orders are finalized.
B) Increase consolidation weighting so the planning run continues reducing freight order count across installation and replenishment freight.
C) Keep the current planning setup and ask installation coordinators to request wider school access periods after planning.
D) Exclude all classroom installation kits from automatic planning so installation coordinators can manage timing manually.
2. CHALLENGE 2 - Freight Order Grouping for Invoice Matching
A planner manually adjusts a bonded warehouse freight order so carrier communication can be sent quickly. The freight order is executable, but its grouping no longer matches the structure finance expects for carrier invoice review.
What is the best recommendation?
Response:
A) Validate that freight order grouping preserves the warehouse shipment structure needed for invoice matching.
B) Accept the freight order because execution capability is sufficient for first-close preparation.
C) Convert all bonded warehouse shipments into standard plant shipment processing for the first close.
D) Delay all freight order execution until each carrier invoice has been manually reviewed by finance.
3. A regional farm equipment distributor is preparing a phased SAP S/4HANA Transportation Management rollout for outbound dealer deliveries. The first release must support planned freight orders for standard dealer replenishment, while urgent field-repair shipments remain temporarily managed through the existing dispatch process. The business sponsor wants both shipment types included immediately to avoid split operational reporting.
The transportation consultant notes that field-repair shipments follow different packaging, carrier response, and delivery-time rules that have not been validated in the target process. The constraint is to deliver a stable first release with useful transportation visibility while avoiding premature inclusion of unvalidated emergency logistics flows.
Which scope decision best aligns with the rollout constraint?
Response:
A) Delay the full SAP S/4HANA Transportation Management release until dealer replenishment and field-repair shipments can be validated together.
B) Configure settlement for both shipment types first so finance reporting determines which transportation flows should be included.
C) Activate dealer replenishment in the first release and keep field-repair shipments on a documented later transition path after process validation.
D) Include dealer replenishment and field-repair shipments in the first release so reporting coverage is complete from the start.
4. A regional security hardware distributor is defining SAP S/4HANA Transportation Management scope for scheduled branch replenishment and same-day replacement lock shipments. The first release must support planned freight orders, execution visibility, and later settlement for replenishment. Same-day replacement shipments still depend on local branch authorization, variable pickup responsibility, and short-notice carrier confirmation that have not been validated in the target process.
The field service lead wants same-day replacements included immediately because they affect service response reporting. The transportation consultant warns that unclear ownership could create planning exceptions and freight cost disputes. The constraint is to deliver a stable first release while keeping replacement shipments available for a later controlled transition.
Which blueprinting decision best supports the rollout constraint?
Response:
A) Configure settlement for replacement shipments first so cost ownership determines whether the flow is ready.
B) Include same-day replacement shipments immediately so service response reporting is complete in the first release.
C) Delay scheduled branch replenishment until replacement shipments can follow the same transportation process.
D) Activate scheduled branch replenishment first and define replacement shipments as later-wave scope after ownership and process validation.
5. CHALLENGE 3 - Carrier Communication for Special Equipment Execution
A carrier is confirmed for a heavy assembly, but the output communication does not clearly reflect the special equipment and loading assumptions used by the warehouse. Crane time has already been booked based on the planner's expectation.
What should the consultant recommend?
Response:
A) Require finance to approve oversized charges before warehouse teams book crane time.
B) Validate that freight order details, subcontracting, and carrier communication reflect the required special equipment before loading preparation.
C) Remove special equipment details from freight orders so carriers can decide handling requirements independently.
D) Continue with the booking because warehouse speed is more important than carrier communication during rollout planning.
Solutions:
| Question # 1 Answer: A | Question # 2 Answer: A | Question # 3 Answer: C | Question # 4 Answer: D | Question # 5 Answer: B |
We're so confident of our products that we provide no hassle product exchange.


By Griselda

