Latest Scrum SSM Free Certification Exam Material with 246 Q&As [Q23-Q48]

Share

Latest Scrum SSM Free Certification Exam Material with 246 Q&As 

UPDATED SSM Exam Questions Certification Test Engine to PDF


Scrum SSM Exam consists of 45 multiple-choice questions that need to be completed within 90 minutes. SSM exam is computer-based and can be taken online from anywhere in the world. The questions are designed to test the candidate's ability to apply the SAFe principles and values to real-world situations. SSM exam is designed to be challenging, and it is recommended that candidates have at least one year of experience working with Agile and Scrum methodologies before attempting to take the exam.

 

NEW QUESTION # 23
What action should be taken on Relentless Improvement Backlog items from the Problem Solving Workshop?

  • A. Use as direct input into the PI Planning session that follows
  • B. Calculate for cost before continuing
  • C. Assign points or prioritization levels
  • D. Assign to the team best suited to solve

Answer: A


NEW QUESTION # 24
What is an anti-pattern to motivation?

  • A. Market disruption
  • B. Team goals
  • C. Maximizing purpose
  • D. Individualized compensation

Answer: D


NEW QUESTION # 25
The goal of DevOps is to improve collaboration across the value stream by developing and automating a ____________________________________.

  • A. Continuous Delivery Pipeline
  • B. Delivery on Demand structure
  • C. Development routine
  • D. Implementation Roadmap

Answer: A


NEW QUESTION # 26
Who commits to the plan at the end of iteration planning?

  • A. team
  • B. scrum master
  • C. solution owner
  • D. product owner

Answer: A


NEW QUESTION # 27
What are the three pillars of Scrum?

  • A. Transparency
  • B. adaptation
  • C. Courage
  • D. inspection
  • E. Agility

Answer: A,B,D


NEW QUESTION # 28
What provides objective evidence that the system is iterating?

  • A. PO Sync
  • B. System Demo
  • C. Scrum of Scrums
  • D. Daily Stand-ups

Answer: B


NEW QUESTION # 29
How many Iterations would it take for a team with a velocity of 20 story points per Iteration to finish a backlog of 60 story points?

  • A. 1 Iteration
  • B. 2 Iterations
  • C. 4 Iterations
  • D. 3 Iterations

Answer: D


NEW QUESTION # 30
What are two common PI planning anti-patterns?

  • A. Team decides which changes need to happen and when
  • B. Stories are created for the PI planning iterations
  • C. Part-time scrum masters do not have time to plan as part of the team
  • D. Too much time spent analyzing each story
  • E. Too much time spent prioritizing features

Answer: C,D


NEW QUESTION # 31
How do Agile Teams ensure their own Retrospective Improvement actions are implemented?

  • A. Discuss improvement actions during the Inspect and Adapt event and get confirmation from other Agile Teams on implementation
  • B. Use the Release Train Engineer to hold the Agile Team accountable for their improvement actions
  • C. Have the Scrum Master implement the team improvement actions so the team can focus on the development
  • D. Add improvement stories to the Team Backlog to implement in the next Iteration

Answer: D


NEW QUESTION # 32
What are two primary opportunities in SAFe for driving relentless improvement? (Choose two.)

  • A. Iteration review
  • B. Iteration retrospective
  • C. Inspect and adapt event
  • D. Management review and problem-solving meeting
  • E. Daily stand-up

Answer: B,C


NEW QUESTION # 33
What are two Release Train Engineer responsibilities? (Choose two.)

  • A. Facilitate PI Planning readiness and the event itself
  • B. Manage and prioritize the flow of work to the program
  • C. Build an effective Product Owner / Product Manager team
  • D. Drive relentless improvement through Inspect and Adapt
  • E. Understand Customer needs; validate solutions

Answer: A,D


NEW QUESTION # 34
The 5-Whys is used to avoid:

  • A. logic traps and anomolies
  • B. blaming others
  • C. assumptions and logic traps
  • D. black holes

Answer: C


NEW QUESTION # 35
What is the connection between feedback and optimum batch size?

  • A. Small batch sizes lower transaction costs
  • B. Lack of feedback contributes to higher holding cost
  • C. Feedback and batch size are generally not connected
  • D. Large batch sizes reduce transaction cost and provide a higher return on investment

Answer: B

Explanation:
Explanation/Reference:
https://www.scaledagileframework.com/visualize-and-limit-wip-reduce-batch-sizes-and-managequeue- lengths/


NEW QUESTION # 36
A servant leader knows that his or her own growth comes from what?

  • A. Facilitating growth of others
  • B. Management support
  • C. Implementing a CALMR approach to SAFe
  • D. Effective training

Answer: A


NEW QUESTION # 37
Which statement describes how Kanban Teams handle velocity in SAFe during PI Planning?

  • A. They need to estimate their velocity in story points
  • B. They use throughput as an indication of their velocity
  • C. They use cycle time because it is more objective and based on actual timestamps
  • D. They participate in scoring Business Value; however, they have a different measure than velocity

Answer: B

Explanation:
Explanation/Reference:
https://www.scaledagileframework.com/team-kanban/


NEW QUESTION # 38
One of the Scrum Master's main responsibilities is to communicate with management and outside stakeholders to help the team in what way?

  • A. Manage the Iteration Planning Backlog
  • B. Protect them from uncontrolled addition of work
  • C. Accept stories
  • D. Split bigger work items where necessary

Answer: B

Explanation:
Explanation/Reference:
https://www.scaledagileframework.com/scrum-master/


NEW QUESTION # 39
What are two key areas a team should be organized around? (Choose two.)

  • A. Business logic
  • B. Features
  • C. Enablers
  • D. Middleware
  • E. Platform

Answer: B,C


NEW QUESTION # 40
A team achieved less than 80% during the quantitative measurement of the Inspect and Adapt workshop.
What would be an unacceptable action for this team's Scrum Master to take?

  • A. Hold the team self-assessment at any time and do not wait for the Iteration Retrospective
  • B. Decide improvement actions for the team to implement
  • C. Coordinate with the System Team to coach this team on Continuous Integration and test automation
  • D. Retrain team members on Agile practices

Answer: C


NEW QUESTION # 41
Why is it important to organize the work for Iteration Planning?

  • A. So the backlog can be prepared
  • B. So a realistic work scope can be defined
  • C. So the team can load balance
  • D. So the Scrum Master can prepare workload for the Continuous Delivery Pipeline

Answer: B


NEW QUESTION # 42
There is no way a team can fail if they carry out all of the Scrum or Lean-Agile events successfully.

  • A. True
  • B. False

Answer: B

Explanation:
Explanation/Reference:
See Poor Collaboration


NEW QUESTION # 43
What are two Release Train Engineer responsibilities? (Choose two.)

  • A. Facilitate PI Planning readiness and the event itself
  • B. Manage and prioritize the flow of work to the program
  • C. Build an effective Product Owner / Product Manager team
  • D. Drive relentless improvement through Inspect and Adapt
  • E. Understand Customer needs; validate solutions

Answer: A,D

Explanation:
Explanation/Reference:
https://www.scaledagileframework.com/release-train-engineer-and-solution-train-engineer/


NEW QUESTION # 44
What is the Scrum Master's role in team breakout #1?

  • A. Raise team level risks
  • B. Create mitigation plans for each risk
  • C. Resolve dependencies with other teams
  • D. Facilitate the coordination with other teams for dependencies

Answer: D


NEW QUESTION # 45
How does a Scrum Master lead a team's efforts in relentless improvement?

  • A. By facilitating the team retrospective
  • B. By facilitating a team meeting
  • C. By eliminating impediments
  • D. By focusing on the Iteration goals

Answer: A


NEW QUESTION # 46
Achieving the goals of Release on Demand requires an understanding of how to decouple what?

  • A. The Project Increment
  • B. The release from deployment
  • C. The Iterations Demos
  • D. The System Demos

Answer: B

Explanation:
Explanation/Reference:
https://www.scaledagileframework.com/continuous-deployment/


NEW QUESTION # 47
When working with an Agile Team, what is expected from Product Management?

  • A. To provide the iteration goals to the team
  • B. To prioritize the team backlog
  • C. To clarify the scope of feature work
  • D. To define the technical software specifications

Answer: C


NEW QUESTION # 48
......

Get The Important Preparation Guide With SSM Dumps: https://www.surepassexams.com/SSM-exam-bootcamp.html

Get Totally Free Updates on SSM Dumps PDF Questions: https://drive.google.com/open?id=1Z4nh6C4Hk6tDXDcLQhlCZum3soTi2bGp