SAP C-DBADM-2601 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified - Database Administrator - SAP HANA (C_DBADM_2601) |
| Exam Number: | C-DBADM-2601 |
| Passing Score: | 65% |
| Real Exam Qty: | 80 |
| Available Languages: | English |
| Related Certifications: | SAP Certified Technology Associate - SAP HANA 2.0 SAP Certified Technology Associate - SAP HANA Administration |
| Exam Duration: | 180 minutes |
| Exam Format: | Multiple choice, Multiple response, Scenario-based questions |
| Recommended Training: | SAP HANA Administration Training |
| Exam Registration: | SAP Certification Registration |
| Sample Questions: | SAP C-DBADM-2601 Sample Questions |
| Exam Way: | Online proctored or test center exam |
| Pre Condition: | Recommended experience with SAP HANA administration and basic database concepts |
| Official Syllabus URL: | https://training.sap.com/certification/ |
SAP C-DBADM-2601 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Installation and Configuration | - SAP HANA installation procedures - Initial configuration and setup |
| Security and Authorization | - Security roles and privileges - Authentication and authorization concepts |
| Database Administration | - Backup and recovery operations - User and role management - Schema and object administration |
| SAP HANA Architecture and Core Concepts | - In-memory database concepts - Tenant and system database concepts - SAP HANA system architecture overview |
| Monitoring and Performance Tuning | - Resource management - Performance analysis and troubleshooting - System monitoring tools (HANA Cockpit) |
SAP Certified - Database Administrator - SAP HANA Sample Questions:
CHALLENGE 3 - Quota and Source Coordination for Multi-Vendor Materials
The sourcing lead wants to preserve vendor-sharing for priority materials so the first live week has more resilient coverage. A plant buyer wants to simplify those same materials to a single vendor during cutover because the order path looks more stable. Which option is most appropriate?
- A. Switch all priority materials to a single vendor because cutover stability always outweighs sourcing resilience
- B. Let each plant decide which materials will use multi-vendor behavior during the first live week
- C. Preserve the intended multi-vendor pattern and verify whether source coordination can remain stable under representative cross-plant demand
- D. Postpone supplier-sharing validation until invoice continuity testing is complete
Correct Answer: C 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
A regional public transit operator runs SAP HANA on-premises for ridership analytics and has a separate SAP HANA Cloud evaluation instance for future reporting modernization. During an operations handover, the administrator finds that the support matrix lists both environments under one administrator contact and one validation checklist. SAP HANA cockpit evidence exists for the on-premises workload, while SAP HANA Cloud Central evidence exists for the evaluation instance.
The constraint is that first-level support must route operational incidents correctly without confusing active production administration with cloud evaluation readiness. The support matrix must remain useful for both environments.
Which action best corrects the support matrix?
- A. Separate the support matrix entries by active on-premises workload and SAP HANA Cloud evaluation instance, with each mapped to its own validation evidence.
- B. Assign all incidents to the cloud evaluation contact because modernization planning is already in progress.
- C. Remove the SAP HANA Cloud evaluation instance until it becomes the active reporting environment.
- D. Keep one support matrix entry because both systems are administered within the SAP HANA database administration scope.
Correct Answer: A 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
A packaged foods company is preparing a controlled maintenance cycle for its on-premises SAP HANA environment while keeping a separate SAP HANA Cloud database available for downstream reporting. The initial upgrade preparation completed, but the final readiness review shows that one administration path still reflects pre-maintenance behavior while the main lifecycle checks show the target state for most components. No broad outage is visible, yet the validation team cannot sign off because the operational view is inconsistent.
The maintenance coordinator wants to avoid unnecessary rollback and complete only the correction needed to restore lifecycle consistency before the business window opens.
Which action is the best choice?
- A. Roll back the entire maintenance cycle because any inconsistent administrative view proves the upgrade cannot be trusted.
- B. Redirect all validation to the cloud database and postpone the remaining on-premises lifecycle correction to a later window.
- C. Confirm which lifecycle element remains out of sync and complete the pending maintenance finalization before releasing the system.
- D. Accept the current state because most components already show the target level and no outage is visible.
Correct Answer: C 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
CHALLENGE 1 - Cutover Configuration Evidence Traceability
A database administrator proposes accepting the cutover comparison now and adding a note that one configuration value was documented outside the current record. Which response is most defensible?
- A. Move the value review to the cloud migration workstream to avoid release delay.
- B. Accept the note because it acknowledges the difference without delaying cutover preparation.
- C. Ignore the note because monitoring notes already prove the configuration was observed.
- D. Require the current administration record to reflect the active value before comparison acceptance.
Correct Answer: D 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
A regional consumer electronics repair company is rehearsing migration from SAP HANA on-premises to SAP HANA Cloud. The migration tool completes the transfer, and database explorer confirms that representative queries return expected values on the cloud target. During validation, the administrator sees that the source system was monitored during export, but the cloud target was not included in the routine backup validation checklist after import. The project lead wants approval because data access was confirmed.
The constraint is that the migration wave must prove the cloud target can be operated after import. The approval evidence must include resilience readiness for the migrated state, not only query validation.
Which recommendation is most appropriate?
- A. Approve the rehearsal because representative cloud queries returned expected values after the transfer.
- B. Defer cloud backup validation until production cutover because the rehearsal already confirmed target query access.
- C. Add the cloud target to the post-import backup validation checklist, run the validation for the migrated state, and approve only after evidence is recorded.
- D. Repeat the full transfer because missing target backup validation proves the migrated data was not imported correctly.
Correct Answer: C 🗳️
Explanation: Only visible for SurePassExams members. You can sign-up / login (it's free).
We're so confident of our products that we provide no hassle product exchange.


By Setlla

